There is no doubt that the system is going to be designed for it. The EA documents have certainly looked the part, especially the MSF. Metrolinx's public-facing marketing wank (sorry, presentations) have indicated as much.
But as we have seen with other projects, the EA documents do not necessary describe the actual built configuration of the line. The MSF may only get built to a configuration two-thirds of the final form if there is no need to do so in the immediate future. That means that any future improvements in service would require an expansion of the MSF first.
I'm not confident that this contract alone will be enough to get Hitachi to set up a facility here, but I would welcome being wrong on it.
Dan