Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

Here are some pictures taken today.

20230927_102602.jpg
20230927_102657.jpg
20230927_102720.jpg
20230927_102732.jpg
20230927_120524.jpg
 
Photos taken today, Friday (Sept. 29). Since my last set of photos last Friday, the 6th set of hangers have been installed (I did post a photo of that Sunday); the north Rail Climbing System (RCS) has been raised to the 10th floor; the yellow netting that had been put on the east RCS has now been added to the north and west RCSs; windows have been added on the 10th floor along the east and north sides from what I can tell, and the cladding looks complete on the west side, suggesting that the west RCS will soon also be raised to the 10th floor. And the forms on the corners have been raised one level, already covering the base of the new hangers.

Starting with my weekly "time-lapse" photo, various views of the RCSs, including the cladding on the SW corner... beauty shots... and the lower mechanical level on the east side.


UTIMG_5606.jpg
UTIMG_5656.jpg
UTIMG_5684.jpg
UTIMG_5717.jpg
UTIMG_5753.jpg
UTIMG_5783.jpg
UTIMG_5793.jpg
UTIMG_5806.jpg
UTIMG_5828.jpg
UTIMG_5852.jpg
 
Last edited:
Back in the day when 2 Bloor West and East where the predominant towers for that intersection. And remained as such for decades and a dog's age...
 

Back
Top