Toronto One Bloor East | 257.24m | 76s | Great Gulf | Hariri Pontarini

To be fair it will likely look better when the retail space is occupied.

I think the green-hued glass also appears more transparent in day light (at least in the pictures) as compared to the reflective ones used on the residential units, which would make sense since retailers would want potential shoppers to see inside the store from afar and be enticed into entering it.
 
This morning.

IMG_3315.JPG
 

Attachments

  • IMG_3315.JPG
    IMG_3315.JPG
    600.3 KB · Views: 421
17 floors left for balcony glass. Can't wait, I'm really eager to see this as a "finished product".

Any bets when occupancy begins? March? April?
 
IMG_4533.JPG
IMG_4534.JPG
IMG_4535.JPG
IMG_4536.JPG
IMG_4537.JPG
IMG_4538.JPG
IMG_4539.JPG
IMG_0529.JPG
IMG_0530.JPG
More from street level today.
Occupancy has already begun I believe.
 

Attachments

  • IMG_4533.JPG
    IMG_4533.JPG
    1.1 MB · Views: 414
  • IMG_4534.JPG
    IMG_4534.JPG
    866.3 KB · Views: 403
  • IMG_4535.JPG
    IMG_4535.JPG
    869.8 KB · Views: 402
  • IMG_4536.JPG
    IMG_4536.JPG
    786.7 KB · Views: 392
  • IMG_4537.JPG
    IMG_4537.JPG
    750.1 KB · Views: 393
  • IMG_4538.JPG
    IMG_4538.JPG
    867.8 KB · Views: 401
  • IMG_4539.JPG
    IMG_4539.JPG
    908.6 KB · Views: 388
  • IMG_0529.JPG
    IMG_0529.JPG
    1.7 MB · Views: 408
  • IMG_0530.JPG
    IMG_0530.JPG
    2.4 MB · Views: 425
17 floors left for balcony glass. Can't wait, I'm really eager to see this as a "finished product".

Any bets when occupancy begins? March? April?
I'm pretty sure occupancy has already begun. There are tons of rental listings on MLS with immediate occupancy, and you can see lots of lights on in the building at night.
 
Does anyone know what the plans are for lighting the "crown" of the building? When are move-ins supposed to start?
 

Back
Top