Toronto Maverick | 154.53m | 49s | Empire | Arcadis

Hi guys, I saw units on the 25th floor and below are already occupied. Does anyone know how much the monthly occupancy fee is for a 1 bedroom unit? When is the final closing date?
 
Hi guys, I saw units on the 25th floor and below are already occupied. Does anyone know how much the monthly occupancy fee is for a 1 bedroom unit? When is the final closing date?

Wrong thread.

 
July 9: Major work on the King Street sidewalk, with the traffic on King Street being held while pedestrians are directed to the north sidewalk on King Street to get around the construction.

20240709_125712.jpg
 
Just wonderful to see these facades properly cleaned up, if the streetscape is 1/2 way decent this will be quite good..

I have to say, when @AHK and @PMT are on a roll on the same night, keeping up with them is a calorie-burner.
 
Love how the heritage planners decided it was important to "restore" 2.5 storeys of the old facades but the ground floor elevation was a free-for-all.
 

Back
Top