Toronto Massey Tower Condos | 206.95m | 60s | MOD Developments | Hariri Pontarini

Before it's gone forever once the building rises above-grade, note the ghost of the original 1905 banking hall on the rear façade of the heritage bank (the skylight and vault were removed in the 1950's) as can be seen on one of the original Darling & Pearson drawings:

(Pic by Drum118)
Fantastic!
 
Does anyone know how long it will take to complete the street level floor? I want to see this baby go up!
 
This afternoon:
IMG_20160401_144004.jpg
 

Attachments

  • IMG_20160401_144004.jpg
    IMG_20160401_144004.jpg
    1.9 MB · Views: 3,670
From yesterday:

DSC00371.jpg

DSC00372.jpg

DSC00363.jpg


42
 

Attachments

  • DSC00363.jpg
    DSC00363.jpg
    352.4 KB · Views: 3,082
  • DSC00371.jpg
    DSC00371.jpg
    360.3 KB · Views: 3,125
  • DSC00372.jpg
    DSC00372.jpg
    357.6 KB · Views: 3,097
From earlier today, with the bridge now a startling 8 inches above the slab:

DSC00734.jpg
DSC00736.jpg


Closer to the Yonge Street frontage, the site isn't quite up to ground level yet.
DSC00738.jpg
DSC00739.jpg
DSC00740.jpg


42
 

Attachments

  • DSC00734.jpg
    DSC00734.jpg
    454.3 KB · Views: 2,725
  • DSC00736.jpg
    DSC00736.jpg
    347.1 KB · Views: 2,711
  • DSC00738.jpg
    DSC00738.jpg
    411.9 KB · Views: 2,712
  • DSC00739.jpg
    DSC00739.jpg
    409.4 KB · Views: 2,714
  • DSC00740.jpg
    DSC00740.jpg
    454.4 KB · Views: 2,732
Every time I see pictures of the site, I'm just amazed at how small it is—it's really quite remarkable what they're able to do here. Also sort of makes one think that just a smidgen of engineering prowess applied across the city could reduce the number and size of site intrusions into vehicular and bike lanes and sidewalks.
 
April 15
By the end of the month, by my thumb rule, building officially at grade. Number of shots this day was less than the past and will be almost next to none in the coming weeks until its above the existing buildings around it. More up on site
26289438820_0b30cb38cd_h.jpg

25957347424_e32d25fb80_h.jpg

25959411503_07c8790b87_h.jpg

25957356374_e5e24f038b_h.jpg

25959430853_654fa10818_h.jpg

26536467566_4271167513_h.jpg

26536451416_e71605cff2_h.jpg

26536461936_dcdb0acc96_h.jpg

26536385636_9a418238d3_h.jpg

26562411315_1a6e56d1fc_h.jpg
 
Now that the project is at grade, the bridge, which straddled the excavation and allowed exiting from the Elgin/Wintergarden Theatres to St. Enoch's Square, has been removed:

masseybridgeremoval.jpg


masseybridgeremoval2.jpg
 

Attachments

  • masseybridgeremoval.jpg
    masseybridgeremoval.jpg
    138.5 KB · Views: 1,590
  • masseybridgeremoval2.jpg
    masseybridgeremoval2.jpg
    145.2 KB · Views: 1,557

Back
Top