What makes you think they will have 300 different trucks? Concrete needs to be used within x hours so I assume there may be 30 or 40 trucks (maximum) making multiple runs from the concrete plants and any line of trucks will be fairly small.300 trucks? I cannot even imagine what that will look like. Where will they line up? Just in a constant rotation?
I will need to walk by. 9 trucks and I'm usually like - wow that's a lot. Hell 4 and I think that.
What makes you think they will have 300 different trucks? Concrete needs to be used within x hours so I assume there may be 30 or 40 trucks (maximum) making multiple runs from the concrete plants and any line of trucks will be fairly small.
Does anyone know the estimated time this building will top out?
On a more… current view, I hope someone got some more pictures or video of today's pour!!
No way, its going to take 1/2 year just to get off the ground...more like 2 years if everything goes smoothAt 60 storeys plus underground and more complicated podium floor plates you are looking at an absolute minimum of approx 1 week per floor so somewhere beyond a year from now.