Toronto Massey Hall Revitalization at the Allied Music Centre | 48.46m | 7s | KPMB

Today.
7EA14518-878F-44BE-A05B-F4E9E4161DCC.jpeg
B2C2E8ED-3E1F-48CA-9EEA-8D83685883E4.jpeg
EFB51363-DBF0-4AD6-939F-BE4CB67F87A3.jpeg
52BC794C-0F99-4970-AEB6-12D2F6B61E72.jpeg
 
Nice to see some effort on an otherwise completely blank wall. Reflections should be a lot of fun from here.
 
I am still a bit puzzled why they did not seem to wash down the external brick and 'amazed' that they have not (yet?) cleaned the brick that is now inside the glazed 'walkways'.
 

Back
Top