Toronto M5V Condominiums | 118.87m | 35s | Lifetime | Core Architects

3457568558_c2d5213d98_b.jpg


3456748245_852c2c0892_b.jpg
 
looking good

i guess everyone was out and about on sunday. i also happened to be there myself... looks like things are moving along nicely.
 
They are pouring concrete in a hole. That concrete will eventually form a subterranean parking structure over which the building, once out of the ground, will rise.
 
PE's post strikes me as right on the money.

42
 
I went by M5V on Monday.
Ive attached a pic ( sorry I dont know how to add it as an image)
 

Attachments

  • m5v condo2.jpg
    m5v condo2.jpg
    109.1 KB · Views: 300

Back
Top