Mississauga M4 at M City | 215.6m | 67s | Rogers Real Estate | Core Architects

April 30
Looks like 2-3 months before it is at grade
53702815429_1b6315ca9d_b.jpg

53701579512_915c3d2bb2_b.jpg

53702815354_de99c21d4b_b.jpg
 
Aug 7
The north east corner could be a grade come Sept with the whole grade in Oct.
53915663165_a6c102d920_b.jpg

53915563229_d0991c8469_b.jpg

53915213096_b785048ed0_b.jpg

53915213176_3575bd4be6_b.jpg

53914327167_616dec529d_b.jpg
 
I honestly don't know why there are separate threads for both M4 and M5. They're going up simultaneously and M1 and M2 had a combined thread. I think The M5 thread should be consolidated with this thread like the Edge/Oro thing.
1729169662083.jpeg

1729169724632.jpeg
 
Dec 3
Unedited not on line at this time with the south still not at grade
133A2327.JPG
133A2328.JPG
133A2329.JPG
133A2330.JPG
133A2331.JPG
 

Back
Top