Toronto M2M Condos | 129.9m | 40s | Aoyuan | Wallman Architects

20191227_111536.jpg
20191227_111551.jpg
20191227_111639.jpg
20191227_111644.jpg
 
  • Like
Reactions: PMT
- Original SilverCore approved redevelopment of NewtonBrook Plaza had the Community Centre & Non-Profit Child Care space within the new Park (eastern edge of site)

- New developer Aoyuan M2M proposed moving the Community Centre & Non-Profit Child Care space into Phase 2 condo podium so new Park would have more open space
- New developer Aoyuan M2M also proposed introduction of a new Public Library within the required Community Space taking up about 40% of Phase 2 podium - at the rear (as pictured below) as follow: Non-Profit Child Care Centre on 1st floor, Public Library on 2nd floor and Community Centre on 3rd Floor
M2M-2ndPhaseOld.png

I posted about this last Spring when Aoyuan proposed it to City & Community:

Problem is:
- Councillor Office didn't like Community Centre & Public Library hidden in rear of podium away from Yonge Street
- Toronto Parks & Recreation thought the proposed 25,000 square feet Community Centre was "too small to be functional"

Toronto Parks & Recreation suggested getting another 20,000 square feet for the Community Centre which local Councillor Filion requested from developer Aoyuan; not officially finalized yet but Aoyuan seems happy to oblige so Community Centre will increase to 45,000 square feet while Public Library & Child Care Centre space will remain basically the same size (each covering about 40% of phase 2 podium floor-plate). I suspect the new Community Centre & Public Library will also have more visibility from Yonge Street (at the cost of Retail space) or at least a token entrance on Yonge Street.

To see new site plan of Community Centre, Child Care centre & Public Library - we'll have to wait until Aoyuan officially submit Site Plans for Phase 2
 
Last edited:
For decades, folks in Silverview Community (directly east of Newtonbrook Plaza) would just cut through Newtonbrook Plaza's parking lot to access Yonge Street - many were worried about losing that access during construction. Thus, as part of agreement between Silverview Community Association/City and previous Silvercore and now Aoyuan M2M for this Newtonbrook Plaza Redevelopment; the Silverview Community (directly east of subject site) gets direct access to Yonge Street during construction.

I've modified @Edward Skira 's photo to highlight the access in yellow (@AlbertC 's Dec 27 photo shows the western access a bit better near orange fencing at wooden fence opening - where you can see parking lot). Photo shows southern end of site, where there's a wooden fence on condo side of property line - north of that is a temporary wire fence (little white signs posted throughout) on Aoyuan's M2M side of property line,... this creates a temporary walkway from just east of Yonge Street to the residential house area of Silverview community. This walkway have been blocked off for the last month due to Covid-19.
IMG_2575_M2M_SouthA1.jpg


IMG_3153.JPG
 

Back
Top