We labelled this one as complete, and is is occupied........... however.......some projects tied to this building's approval are still not quite done.
First, we'll look at some road work out front on Main Street. The approval required that the leg of Main Street which becomes Stephenson have its intersection with Main Street (primary) regularized by creating a substantial new sidewalk bump out.
Notwithstanding that sidewalks were newly poured here a few months ago...........
I can't say for sure, but since I see watermains off to the side, I'm assuming this project waited on Toronto Water...........sigh, good job everyone! Why did / pour once, when you can do it twice!
***
Also, as part of this project, there was supposed to be a new super-mini park, just one house lot wide, at the south-west of the building site; that 'park' can be found here:
There is literally a material sized park less than 1/2 a block away on the same street. I take real issue w/this. I gather this was conceived of as part of a new mid-block connection to Danforth. I'm fine w/the theory, but would note, this isn't mid-block, and I'm also not sure why a mid-block connection should be classed as a park, per se...........
****
Oh, before we depart this thread............they did finish their planting beds...........but....but.
Really? No, they did no mean for the middle of the bed to be all thistle. Underneath that you can see what I take to be some variation of creeping Juniper......... clearly no one has been weeding, and the Juniper are too under-sized to own the space.