Toronto Leaside Innovation Centre | 35.43m | 7s | Beeches | Studio Canoo

Excluding the MPH here, we've got 33.5M of height on a 6s building.

That's over 5.5M per floor or about 18ft.

It's tall but not 4.8 to 5m per floor isn't unusual for Office.

Leaving 11 foot ceilings (advertised feature) under a typical office false ceiling with tall (relative to steel) wood beams for floors might requires more height.
 
A piece in the Globe and Mail tips us off that this building has changed.

It's no longer Mass Timber; it's concrete and Steel.

Aesthetically, it's had a notable downturn.

Originally conceived as offices, this will now be a building for Wet Labs.


Render from the above:

1705418084644.png



The developer moved away from office for the rather obvious reason of market conditions, but had wanted to retain the Mass Timber design originally. But it was deemed incompatible/non-economic with the Wet Labs concept.

From the article:

1705418277047.png
 
A piece in the Globe and Mail tips us off that this building has changed.

It's no longer Mass Timber; it's concrete and Steel.

Aesthetically, it's had a notable downturn.

Originally conceived as offices, this will now be a building for Wet Labs.


Render from the above:

View attachment 533571


The developer moved away from office for the rather obvious reason of market conditions, but had wanted to retain the Mass Timber design originally. But it was deemed incompatible/non-economic with the Wet Labs concept.

From the article:

View attachment 533572
Good to see others reading the G & M - paper version or electronic (which has a variety of advantages, although not quite the same cachet when also consuming your cappuccino and brioche) Two items found interesting in this article were the quotes on the state of office space rentals in Toronto (even if temporary as noted in the quote) and the pivot to a proposed wet lab building. The requirement for these types of facilities is very strong, supply is very low, but, as shown above in the quote, challenges remain.
 

Goldsmith would like to begin construction on the StudioCANOO-designed building before the end of the year.

Goldsmith estimates it will take about two years to complete. He’s willing to build on spec if necessary because he’s confident tenants will come on board as construction progresses and occupancy timelines shorten.

The plan is for the development to be financed with 50 per cent equity and 50 per cent debt, though Goldsmith said he and Schultz will consider adding investment partners.

CBRE is seeking tenants to pre-lease space in the building as well as potential co-investors in the project.

Banks are generally reluctant to finance developments that aren’t pre-leased in today’s economic environment and, since the life sciences asset class is relatively new in Canada, there isn’t a lot of available historical data that may be able to convince them otherwise.

CBRE associate vice-president Daniel Lacey, who authored a report on Toronto’s need for more lab space last fall and is representing Leaside Innovation Campus, told RENX 90 per cent of the potential tenants he’s spoken with don’t have flexible timelines and want to be in new space within 18 months.
 