Toronto Kingston&Co Condominiums | 38.4m | 10s | TAS | Teeple Architects

Walked by the site today...the foundations on this one are interesting. Maybe someone with some knowledge on the subject can chime in on what's being built.

Looking west from Blantyre Ave.
IMG_1711.JPG



And the west end of the site
IMG_1709.jpg


Still some sand to remove:
IMG_1710.JPG




Looking east:
IMG_1708.JPG
 

Attachments

  • IMG_1711.JPG
    IMG_1711.JPG
    1.8 MB · Views: 1,650
  • IMG_1710.JPG
    IMG_1710.JPG
    2.9 MB · Views: 1,626
  • IMG_1708.JPG
    IMG_1708.JPG
    3 MB · Views: 1,615
  • IMG_1709.jpg
    IMG_1709.jpg
    2.5 MB · Views: 1,639
Walked by the site today...the foundations on this one are interesting. Maybe someone with some knowledge on the subject can chime in on what's being built.
I believe you can simply consider these as footings, which go deeper into the earth than the rest of the building. Not sure if they wold include piles going all the way down to rock, or not.

In regards to the sand, the area here—which is on a height ridge—would have been a sandy spit separating the glacial-era Lake Iroquois from a bay to the north.

42
 
This morning

0116b457f1d286b57324b236bea4104b02faaa5123.jpg


0193c200fd1f91736910f3fd9a8681881798c529ea.jpg


010a4a77e911ba4f56abac03ffcf46bd1028536ffc.jpg
 

Attachments

  • 0116b457f1d286b57324b236bea4104b02faaa5123.jpg
    0116b457f1d286b57324b236bea4104b02faaa5123.jpg
    1.1 MB · Views: 1,201
  • 0193c200fd1f91736910f3fd9a8681881798c529ea.jpg
    0193c200fd1f91736910f3fd9a8681881798c529ea.jpg
    1 MB · Views: 1,215
  • 010a4a77e911ba4f56abac03ffcf46bd1028536ffc.jpg
    010a4a77e911ba4f56abac03ffcf46bd1028536ffc.jpg
    996.5 KB · Views: 1,222
They were busy today. Still pouring concrete at 6:30 tonight. From earlier in the day.

01053c29b7e44be7504f3c2b4e6daf3c2f8ff40115.jpg
 

Attachments

  • 01053c29b7e44be7504f3c2b4e6daf3c2f8ff40115.jpg
    01053c29b7e44be7504f3c2b4e6daf3c2f8ff40115.jpg
    712.2 KB · Views: 658

Back
Top