Very true starting with the original CCTT as to where it was built in the 90's. It was built for a city of 250,000 when the city was already over 300,000 with ridership at 25,000 daily. The city was not willing to spend a few extra $$ for a lager size and a different location. 10 years after it open, it had to be expanded to handle the 40,000+ riders and needs to expand again even with routes removed from the terminal..
It was built with a 2nd level for a BRT when it came time to build it. When the BRT was being built, the 2nd level was scrap due to lack of funds and it costing more than it was supposed to.
Starting around 2005.I made the recommendation that a new terminal to handle 125-150,000 riders be built in that hydro and plaza area next to Hurontario or in the north east corner of Sq One lot. Still do. The land EA for Hurontario call for the same location as well the early LRT EA that would see the LRT use the new Absolute Dr extension to City Centre Dr to get over the 403, but was scrap due to Walmart Docking bays as well to the underground docking area.
The current thinking that a new terminal should be built with underground BRT connection on the north side of Rathburn that would go under Hurontario and the follow the original plan to finish building the transitway on the north of the 403 from Duke of York to Erin Mills. QMERS is the white elephant pertaining to this new terminal as its on land they want to build office towers on. Easy to build towers over a bus terminal if the will to do so is there. With ML having its hand in this mess, I expect to see the same mess and thinking with the city always behind the curb for building what is needed in the first place.
Mississauga drop the ball more than once for this area. Not willing to spend $$ for the hockey and sport complex, it got built in no man zone where cars are the only option to get to it today and transit sucking..
What was supposed to be Mississauga Downtown 21 plan vision, is not going to happen. It will be a centre and that all it going to be with no true Downtown until the mall is a 5th of the current size located on a number of floors with other development on top of it.