Toronto Hullmark Centre | 167.94m | 45s | Tridel | Kirkor

Yup. Every single project that's in this stage or close has been at a standstill for the past few days. The Milan site, for example, appears to be completely abandoned. Hopefully June will be nicer weather.
 
Working in the mud.

photo%201.JPG


photo%202.JPG
 
Check out day 2 (May 20, 2011) of Belinda the Intern's visit into the Hullmark site.

Just a sample below of the 74 pictures she took. Check our Facebook Photo Gallery for complete series: http://on.fb.me/k2sF8A

225994_10150182223978983_49618888982_6937743_3040227_n.jpg


228267_10150182223818983_49618888982_6937741_6561084_n.jpg


225379_10150182219783983_49618888982_6937693_3525537_n.jpg


225394_10150182209358983_49618888982_6937602_7940821_n.jpg


Follow Belinda's updates throughout the summer on tridelbelinda.com
 
Last edited:
Jivey and Belinda's photos give an idea of the size of that ramp for the trucks and the equipment.

With all the rain earlier in the week, the site looked like a scene from the front in WW1 (the view from the trenches). Those pipes or rods sticking out of the walls of the shoring; are they for attachment of other materials or concrete in the shoring process?

Have seen these before for other projects.
 
May 26 2011 update:
- a second interior wall, pretty close to the first one, maybe the start of a stairwell
- some more columns were put up, they're building 4 at a time
- the south wall got longer
- they built a staircase, perhaps for the construction workers to use to get into and out of the pit
- yesterday there were about 100 (give or take 50) dump trucks taking dirt away, it looks like excavation is almost complete
- with all the rain my patio is less dusty

DSC_0483.JPG

DSC_0484.JPG


Link to more pictures
 
Thanks for the updates jivey. You can use the freeware 'Autostitch' program if you'd like to create panoramic images - like so;

pano-hullmark2.jpg


Credit to jivey for the image.
 