I could be mistaken, but I believe the angled soffit panels that stretch from the underside of the level 3 slab will meet the top of the black mullions at level 2, and so those white panels will probably just be insulated and covered. It just looks like a funny angled window right now without the mass of the soffit aboveThey’re setting the forms to pour the ceiling of the penthouse floor, then I imagine it will be just steel framing for the mechanical / amenities box on top?
There is curtainwall on almost every side now.
Window wall installation is progressing up to the fourth or fifth floor.
The lobby is now glassed in with more gradated yellow glass (couldn’t get a great shot of it). There is also some glass around the amenities level with a diagonal divide that I hadn’t anticipated. Not sure what the final finish will be.
Looking good!