drum118
Superstar
YesCurrently, the east-west corridor has two tracks. Will provision be included for 3 or 4 tracks for a future east-west GO train?
See https://urbantoronto.ca/forum/threads/go-transit-midtown-corridor.27511/
When they built the West Toronto Diamond Grade Separation, they built the CP Bridges to hold 4 tracks The current 2 tracks are in the centre of the 2 bridges. They even provided room for a 2nd track for the connection to MacTire Sub for the Weston Rd 2 bridges.