Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

I guess this means they're not regrading Wallace. I thought I saw some drawings earlier that showed it going down by ~0.5m?

I recall that also. Going back to message #2122 in this thread, there was ML documentation (since taken down) saying the clearance at Wallace was to be 4.4 m. But the sign on the bridge now says 5.0m. Maybe they changed something to avoid having to put that dip in the roadway?

- Paul
 

Back
Top