Toronto Garrison Point | 118.56m | 35s | Cityzen | Hariri Pontarini

Walking from the Bentway last night.

IMG_20180109_191539.jpg
 
Continuing to rise form the ground!

DSC06976.jpg
DSC06995.jpg


42
 

Attachments

  • DSC06976.jpg
    DSC06976.jpg
    380.2 KB · Views: 705
  • DSC06995.jpg
    DSC06995.jpg
    377.8 KB · Views: 675
What was the purpose again for the structural additions above the rail corridor? Looks fantastic from above!
 

Back
Top