ShonTron
Moderator
Member Bio
- Joined
- Apr 24, 2007
- Messages
- 12,537
- Reaction score
- 9,529
- Location
- Ward 13 - Toronto Centre
Nfitz: I don't understand all the references to the project being killed however. The original decision to send it back to rework clearly didn't kill it; and what has come back seems much more reasonable - and cheaper. And still looks very cool. As much as I despise the pro-Ford dishonesty and lack of transparency at City Hall, the opposition seems to be just as guilty here.
The original design, which was more elegant, would have been built and opened by this time next year until Doug pulled his petty little stunt.
Any new bridge, if all goes well, will be built and opened by this time in 2014. That in itself is a huge deal. The lower cost comes with a cost beyond just the design. Something about knowing the cost of everything and the value of nothing, you know.
Last edited: