Is the basement of the previous building still there or was it removed and replaced with some soil from elsewhere until a full-scale dig starts?

I am not sure how many underground levels the previous building had but they only excavated/removed what looked like 1 level as can be seen in this photo by @jer1961

UTIMG_8419.jpg
 
From today. It is getting to the fun/serious part of constructing this thing. With large sites, it would take ~ 4 months to excavate 4 levels so we will see how fast this progresses given the small lot and tight location they have to work with. In any event, we should see a crane popping up before Xmas 😊

IMG_4440.jpeg

IMG_4439.jpeg
 