Archivistower:
AFAIK, it's all a go, all at once. So many people are registered on th condo shopping list that they have no concerns about selling the building out. The sales centre is being assembled on an Adelaide parking lot just north of the construction site now.
Apparently 2007 will be spent excavating the hole and the bringing the building up to grade level, 2008 will be bringing it to it's full height, and 2009 will see it being finished off inside. They want to have the centre operating by the summer of 2009 so that it is fully ready for the festival that fall. I imagine that occupancy of the lower floor residential units would be concurrent with that.
film-centre buff 42