It occurs to me that the 407 Transitway would be a very good environment for demonstrating low floor automation (among other things I rather strongly suspect that whatever the GTAA comes up with will be a single mixed busway/LRT corridor between Humber College and Renforth).
Why? The 407 Transitway is planned to be fully grade separated, there is absolutely no advantage to using low floor tech for any rail conversion for that corridor. How about we don't pull the same mistake as Ottawa and make a fully grade separated low floor line.
 
Photos from West Open House presentation https://www.metrolinxengage.com/sites/default/files/west_voh_april_14_2021_v6.pdf
Mount Dennis GO/UP
1618590918857.png


Mount Dennis Bus Terminal
1618590985473.png


Keelesdale
1618591060203.png


Caledonia
1618591094754.png


Fairbank
1618591147332.png


Oakwood
1618591198844.png


Cedarvale
1618591236402.png
 
It occurs to me that the 407 Transitway would be a very good environment for demonstrating low floor automation (among other things I rather strongly suspect that whatever the GTAA comes up with will be a single mixed busway/LRT corridor between Humber College and Renforth).

The 407 transitway is a 2050 or later project. A lot about transportation tech will change between now and then.
 
I wonder how many of the east end Traction Power Substations are complete and ready to operate. From past ML notices
TPSS 9 - Don Valley
TPSS 10- Victoria Park
TPSS 11 - Warden
TPSS 12 - Birchmount

I am sure there is redundancy and interconnectivity so maybe only one is needed to begin testing

- Paul
Just curious: At which underground stations are TPSSs 1-8 located?
 
So with the instillation of overhead wires from Brentcliff to Kennedy and potential train testing by the end of the month, my 2 questions are:
1. How are they going to get the test train over there? As for as I know they've only brought trains a few stations away from Mount Dennis.
2. If they instead transport a train to the east end just for testing, where will they keep it? Maybe at Kennedy or Science Centre so its inside?
 
So with the instillation of overhead wires from Brentcliff to Kennedy and potential train testing by the end of the month, my 2 questions are:
1. How are they going to get the test train over there? As for as I know they've only brought trains a few stations away from Mount Dennis.
2. If they instead transport a train to the east end just for testing, where will they keep it? Maybe at Kennedy or Science Centre so its inside?

Kennedy is nowhere near complete enough to "safely" store a train inside. Yes it is a cavern but I don't think it is powered yet nor do I think Metrolinx wants vehicles parked in a construction site for any length of time
 
April 11
Finally got to these 85 photo that are up on site now as well seeing which few I could post here for the 3 locations I shot that day. As you can see the OS was 99% to 100% in place.

Portal to Don Mills
51129634126_8be46970c1_b.jpg

51129843848_81b96eab9a_b.jpg

51129688274_ef79ae3c56_b.jpg

51129631791_ee9801174f_b.jpg

51130743045_ca97ac3333_b.jpg

51129685849_b305538398_b.jpg

51129627811_2eec86aa3e_b.jpg


Sunnybrook Park Station
51129843238_291b0e7b78_b.jpg

51129629116_0ba13c131b_b.jpg

51129630911_c41a59a451_b.jpg

51129684044_0a56e801d5_b.jpg

51129629906_81da8edea8_b.jpg

51129685094_c9b7ebac23_b.jpg

51130742395_063a6b7bca_b.jpg


Sloane Station
51129627561_a64b85f197_b.jpg

51129682229_a8d0bf484b_b.jpg

51129667587_2c0f5468c9_b.jpg

51129667422_2629886ebe_b.jpg

51129681814_fbeb0841e1_b.jpg

51129627021_6d2fddfb9a_b.jpg

51129681459_b6750f3734_b.jpg

51129836363_8e9fcd8115_b.jpg

51129674757_07bac17584_b.jpg

51130746025_a6d2c87b2c_b.jpg
 

Back
Top