Toronto Eaton Centre (Ongoing Renewal) | ?m | ?s | Cadillac Fairview | Zeidler

CF logo today.
96435B0C-F783-4398-AF23-7CEC6DFB8812.jpeg
 

Attachments

  • 96435B0C-F783-4398-AF23-7CEC6DFB8812.jpeg
    96435B0C-F783-4398-AF23-7CEC6DFB8812.jpeg
    269.4 KB · Views: 1,184
September 5, 2018

The underside of the skywalk is illuminated now. The lighting is animated akin to the top of Festival Tower at TIFF Bell Lightbox. The effect is kind of underwhelming and accentuates the dirt that has accumulated since the walkway’s installation.

720CB183-805D-43C5-A5B0-84FF13878D76.jpeg
 

Attachments

  • 720CB183-805D-43C5-A5B0-84FF13878D76.jpeg
    720CB183-805D-43C5-A5B0-84FF13878D76.jpeg
    218 KB · Views: 1,344
October 2, 2018

New BMO campus from Trinity Square
EF2A8694-BEC2-4237-8421-30EBCF09B45C.jpeg


Walkway from Trinity Square to Dundas
5E93A5D8-C9B3-4851-B8AA-1C3955B54E64.jpeg


Adjacent to Ryerson business school
EE7D66B1-4DEB-4EB7-87CB-DD71C290E0A1.jpeg
 

Attachments

  • EF2A8694-BEC2-4237-8421-30EBCF09B45C.jpeg
    EF2A8694-BEC2-4237-8421-30EBCF09B45C.jpeg
    187.1 KB · Views: 1,716
  • EE7D66B1-4DEB-4EB7-87CB-DD71C290E0A1.jpeg
    EE7D66B1-4DEB-4EB7-87CB-DD71C290E0A1.jpeg
    193.7 KB · Views: 1,682
  • 5E93A5D8-C9B3-4851-B8AA-1C3955B54E64.jpeg
    5E93A5D8-C9B3-4851-B8AA-1C3955B54E64.jpeg
    257.8 KB · Views: 1,631
Last edited:

Back
Top