Toronto e2 at ePlace | 156.56m | 46s | Capital Developments | TACT Architecture

Mar 20, 2022


20220320_160646.jpg
20220320_160756.jpg
20220320_161906.jpg
20220320_162005.jpg
20220320_162057.jpg
20220320_162133.jpg
20220320_162532.jpg
 
Was taking these photos for @interchange 42 because I thought they were taking down the crane. They were taking down something as there was a large flatbed (having trouble making a left turn on Yonge South onto Roehampton with police on Yonge directing traffic and Roehampton temporarily closed while I was walking by south on Yonge. Took these photos from Broadway 4-29-2022. Anyone figure out what was happening?

DSC04602.JPG


DSC04603.JPG


 
Was taking these photos for @interchange 42 because I thought they were taking down the crane. They were taking down something as there was a large flatbed (having trouble making a left turn on Yonge South onto Roehampton with police on Yonge directing traffic and Roehampton temporarily closed while I was walking by south on Yonge. Took these photos from Broadway 4-29-2022. Anyone figure out what was happening?

View attachment 396751

View attachment 396752
The crane got swapped out for a derrick around the beginning of February, and the derrick's been gone for a while now. Maybe they were hoisting HVAC or BMU equipment up to the roof?

42
 
May 13
More up on my site from various locations.
52076647433_af4e500d27_b.jpg

52077127445_3a3de10372_b.jpg

52076872314_1903498c40_b.jpg

52076872254_24868249d0_b.jpg

52076652438_4b920eb15d_b.jpg

52076652358_a643cfd4c1_b.jpg

52076652233_1064503165_b.jpg

52080134602_5a15fdc538_b.jpg

52080133547_e3f33293c8_b.jpg

52083664566_498f10bece_b.jpg

52083905734_b7afc4cd6a_b.jpg

52082629297_73e0985247_b.jpg

52083663061_6d2b1ece1b_b.jpg

52084159195_7d19b1a906_b.jpg

52083682758_b7f9c1cf3c_b.jpg

52083662651_c51af1258f_b.jpg
 

Back
Top