Metrolinx commented saying "will open by end of next year"... So are we saying December 2023 now? LOOOOOL.
Did I hear that correctly?
Metrolinx commented saying "will open by end of next year"... So are we saying December 2023 now? LOOOOOL.
With the TBM? It's almost all in various sublayers of the Queenstown shale - one would expect softer shales. Some of it is almost more like silt than rock, particularly at the boundary with the lower Silurian.IIRC they hit surprise pockets of softer shale, which tended to bring down the ceiling of the excavation beyond what harder rock would have done.
When did Rob Ford ever get ML to turn the line into heavy rail? The Flexity's were bought and the yard was already designed for LRVs. The line was to be linked with the SRT so heavy rail was near impossible at that time. The only agreement was to turn it into a tunnel using LRVs. ML then decided to pay a premium to reduce the order. As they love to do. They also reduced the order for Citadis when they cut the Hurontario Line's centre loop.
He only succeeded in getting the money spent on the Sheppard LRT grade separation with the Stouffville Line allocated towards ML's own RER expansion budget. Of course nothing was built on Sheppard and that money went towards Finch West instead to use up the Fed's committed funds before they revoke it. The money allocated towards Finch West is then "saved" allowing Queen's Park to uncommit funding to Sheppard East without getting roasted.
All the money "saved" went towards paying premiums for reduced orders and extra costs (e.g. towards Crosstown delays) and taxpayers got nothing in return. Should we be grateful of Queen's Park?
So the TTC isn't perfect? My world is shattered.The issues of the stations werent discovered until well into construction. It turned out the surveys that the TTC provided Metrolinx for underneath Eglinton station were very wrong, and they encountered a lot of unexpected utilities, concrete, garbage from the 1950s subway build etc. It was a disaster that they weren't expecting.
But again, if you’re not sure what you’re getting into, do that part first. Incomplete surveys from the TTC should have been a warning to Metrolinx to conduct their own comprehensive survey and planning.The issues of the stations werent discovered until well into construction. It turned out the surveys that the TTC provided Metrolinx for underneath Eglinton station were very wrong, and they encountered a lot of unexpected utilities, concrete, garbage from the 1950s subway build etc. It was a disaster that they weren't expecting.
It should also be noted that this should not have been unexpected. Engineering surveys from the 1950s and 1960s are notoriously unreliable.But again, if you’re not sure what you’re getting into, so that part first. Incomplete surveys from the TTC should have been a warning to Metrolinx to conduct their own comprehensive survey and planning.
I see MX has given up on providing a completion dateIn a statement on Metrolinx's website on Friday, president and CEO Phil Verster said the Eglinton Crosstown is delayed and will not be in operation this fall as expected. He did not provide a new date for the launch of the service.
Yes it was already confirmed in the news. The line is slated for end of 2023 opening.Metrolinx commented saying "will open by end of next year"... So are we saying December 2023 now? LOOOOOL.
Did I hear that correctly?
Is this a cross section of a tunnel near Niagara Falls? What's the relation to the Crosstown's underground environment?With the TBM? It's almost all in various sublayers of the Queenstown shale - one would expect softer shales. Some of it is almost more like silt than rock, particularly at the boundary with the lower Silurian.
I hadn't realised it was so deep. I haven't been following it closely - I'd have though they would have been higher, to stay out of the Queenston.