Northern Light
Superstar
A report to the October 26th meeting of the Infrastructure and Environment Ctte addresses how residents of Wynford Drive are expected to get to their Crosstown LRT stop, given that the roads are grade-separated.
Report here: https://www.toronto.ca/legdocs/mmis/2021/ie/bgrd/backgroundfile-171902.pdf
The gist is that a new sidewalk/ramp will be built along the connecting ramp/road from Wynford to Eglinton.
****
Aside: How was a solution for this not considered during the initial project design?
Report here: https://www.toronto.ca/legdocs/mmis/2021/ie/bgrd/backgroundfile-171902.pdf
The gist is that a new sidewalk/ramp will be built along the connecting ramp/road from Wynford to Eglinton.
****
Aside: How was a solution for this not considered during the initial project design?
Last edited: