RedRocket191
Senior Member
The entire line will be POP. All doors will open at all stations, manned or not.
While I know you are fully aware of this, it's worth pointing out to those who may not that all streetcar/LRT lines, TC and existing, will be POP using the new Bombardier equipment.The entire line will be POP. All doors will open at all stations, manned or not.
The entire line will be POP. All doors will open at all stations, manned or not.
Yes and no.Do we know what the SRT "upgrades" are supposed to be yet?
The two cities may not be all that comparable, but individual corridors are. The Edmonton line is a subway through the central area much the way the Eglinton line will be. Some comparisons:Do we know what the SRT "upgrades" are supposed to be yet?
Any idea what the ridership numbers are for Calgary and Edmonton on those lines? I know they can't really be directly compared to Toronto as the cities are vastly different than Toronto, but nonetheless it would be interesting to know the numbers (in context).
The report says the tunnel will go from Keele to Brentcliffe (~1 km west of Leslie) although Appendix C shows the tunnel going all the way to Jane.
http://www3.ttc.ca/About_the_TTC/Co...09/May_28_2009/Other/Commission_Report_-_.pdf
Here's the list of stops
1. 4 -5 stops at Pearson Airport
2. Martin Grove Road
3. Widdicombe Hill Boulevard / Lloyd Manor Road
4. Kipling Avenue
5. Wincott Drive / Bemersyde Drive
6. Islington Avenue
7. Russell Road / Eden Valley Road
8. Royal York Road
9. Mulham Place
10. Scarlett Road
11. Emmett Drive
12. Jane Street (Future Jane LRT)
13. Weston Road – under study
14. Black Creek Drive – under study
15. Keele Street
16. Caledonia Road
17. Dufferin Street
18. Oakwood Avenue
19. Allen Road (Spadina Subway)
20. Bathurst Street
21. Chaplin Crescent
22. Avenue Road
23. Yonge Street (Yonge Subway)
24. Mount Pleasant Road
25. Bayview Avenue
?????????????????????????????????????????
26. Brentcliffe Road
27. Leslie Street
28. Don Mills Road (Future Don Mills LRT)
29. Ferrand Drive
30. Wynford Drive
31. Swift Drive / Credit Union Drive
32. Bermondsey Road
33. Victoria Park Avenue
34. Pharmacy Avenue
35. Lebovic Avenue
36. Warden Avenue
37. Birchmount Avenue
38. Ionview Road
39. Kennedy Station (Danforth Subway, Scarborough RT, Future Scarborough / Malvern LRT)
What are they thinking?
This is what I was thinking. Whether it be LRT or Subway, those aren't very mandatory stops.What are they thinking? I'd remove #s 5, 7, 9, 11, 29, 31 and 35 right off the bat. The line has to maintain a high level of speed and frequency in order to be a true LRT service (~35km/h NOT 23km/h). The Jane/Weston, VP/Pharmacy and Brentcliffe/Leslie stations could be merged as all these pairings are within 300m of eachother. Where the heck's Laird Dr, the major N/S artery of Leaside? A tunnel between Keele and Jane makes absolutely no sense because that area is in a valley. Why not simply elevate the guideway through that stretch, with an above-grade station (Black Creek) directly serving the GO corridor? And regarding the Airport Study in the URL; why don't they just swing the LRT up the hydro corridor to the immediate west of Martin Grove, then run it across Dixon into Pearson? At least then the line would be accessible to the high concentration of hotels, bars, eateries and convention centres lining the stretch from Hwy 27 to Carlingview. There's no reason why the bus can't takeover west of Martin Grove/Eglinton Stn.
I wonder if this will make Kennedy Station more safe or less safe... or if safety is pretty much independent of the changes.