Toronto Crosstown LRT: Eglinton Station | ?m | 1s | Metrolinx | Arcadis

Taken today, May 18th, 2023

IMG_7999.jpg
IMG_8001.jpg
IMG_8002.jpg
IMG_8003.jpg
IMG_8004.jpg
IMG_8010.jpg
 
Any concrete poured for the roadway has to "cure" for a month before the mass of traffic can go on it.

From link.
The first 7 days after installation you should spray the slab with water 5-10 times per day, or as often as possible. Once the concrete is poured the curing process begins immediately. To protect your new slab and ensure an exceptional finished product you should wait 24 hours for foot traffic (including pets), 10 days to drive light vehicles or add furniture, and 28 days for heavy pick-up trucks and RVs. After 28 days the concrete is cured and you will have a strong and stable slab.
 

Back
Top