Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

Apr 8, 2022

Waiting for the formwork removal on this latest floor (separating the base section from the high-rise section) to see which of the renderings was picked.

1DAAFB88-1141-4653-B0CC-0732B6B03AA7_1_201_a.jpeg



B1FF82E6-13BA-48D3-AB8E-D836E36A7BCD_1_201_a.jpeg



7195A5D7-7986-45A2-84FE-3B689A71ECA4_1_201_a.jpeg



A08B3FEA-8057-463E-BC42-DC9115D5D07B_1_201_a.jpeg



4B4E3EE9-C91B-4403-AFDE-B704665B68A2.jpeg
 
Last edited:

Back
Top