It feels like work has slowed now that the bridge is in place. Put the railings on and open that sucker up!

I think part of the problem is that the south side of the bridge empties into a fenced-off construction area for the TCHC Building and Parade (mind you I haven`t been up to the linear park there in a couple of weeks).
 
The Banana Bridge at sunset:

Bridge.jpg
 
Last edited:
Great shot.

The bridge would fit in nicely in a steampunk film setting.
 
So.... it's the middle of November now. Is the bridge opening any time soon?

When I was shooting from Bathurst Bridge last Friday, I would say off hand it will not open until spring now.

No handrail on either ramp and no stop light work at Front St. Still a lot of material store in front of Parade blocking access to the bridge.
6320885671_df4cb99867_b.jpg


6320885005_27b4e9074e_b.jpg


6321409052_585199782f_b.jpg
 
I would say it will not open until spring now.

Well if you're right (and you always are) this is very dissapointing.

I wonder if legally/contractually they just had to get the bridge built by a certain time and now they can drag their heels with opening it. Same thing happened with Canoe Landing. It got 'opened' and then closed and then opened for real months later.

I'm going to send a letter to Adam Vaughn to let him know.
 
There's still construction hoarding of Parade 2 blocking access to Fort York Blvd.
I thought the bridge was supposed to be finished Spring 2012 all along.
 
The bridge won't be needed for some time anyway. Right now it empties on to a construction site on one end and the middle of a desolate street on the other. You'd have to cross at Bathurst and Spadina anyway.

The bridge will only truly shine once the Fort York CityPlace community is built. Having the bridge open now will only serve to satisfy our curiosity then we won't use the bridge for months or years until it gets built around.
 
Spring 2012 has been the target for months now. They cannot open it until they have a clear path to Dan Leckie Way. With all the construction going on, that won't happen until spring.
 
The bridge won't be needed for some time anyway. Right now it empties on to a construction site on one end and the middle of a desolate street on the other. You'd have to cross at Bathurst and Spadina anyway.

The bridge will only truly shine once the Fort York CityPlace community is built. Having the bridge open now will only serve to satisfy our curiosity then we won't use the bridge for months or years until it gets built around.

Speak for yourself! As a resident of Cityplace, who routinely travels up to king/queen west (and probably more once that new loblaws opens up) the bridge would be invaluable ASAP.
 
I wonder if legally/contractually they just had to get the bridge built by a certain time and now they can drag their heels with opening it. Same thing happened with Canoe Landing. It got 'opened' and then closed and then opened for real months later.

I'm going to send a letter to Adam Vaughn to let him know.
Yes, they had to build it by a specific time. GO Transit has been the biggest obstacle to the construction of this bridge. GO had ridiculous signal visibility requirements and were being unnecessarily difficult to deal with and uncooperative, according to Vaughan.
 
Last edited:
the bridge construction would not allow that passage to be open during the construction of it, therefor making that hoarding break impossible.
 