Bruvyman
Active Member
It feels like work has slowed now that the bridge is in place. Put the railings on and open that sucker up!
I think part of the problem is that the south side of the bridge empties into a fenced-off construction area for the TCHC Building and Parade (mind you I haven`t been up to the linear park there in a couple of weeks).