From one of the photos, its shows a ramp going to the west of the south section which is odd when it should be going to the east. No stairs due to accessibility issues and bikes.
Having said that, that will be a weeeeee!!! ride down on a slippy day and who going to clear the snow?
If this bridge is to open in Nov, you will be walking through the construction zone, since both projects will not be finish until late 2012 as plan. If the ramp was to the east, the construction zone would have less impact on the access to the bridge.
It was always planned to be west. The original location for the bridge pier/support was supposed to be west of where it is now. The bridge was supposed to go straight from Dan Leckie Way to Portland Street. Since GO/CN wanted the bridge to be higher and decided to place the pier in the location we see today, they had no choice but to use ramps to connect Portland to Dan Leckie.
As for accessibility issues, because a ramp is already being built, you can still have stairs exiting to the east. Its not a problem, just an added cost.