Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
DJI_20241130150850_0013_D.jpg
 
...so no laying on the mounds and smoking doobs in the overnight hours. >.<
 
Saturday and Sunday
IMG_7321.jpeg


IMG_6510.jpeg


Podium almost buttoned up.
IMG_6503.jpeg


Large format glazing on the south side. Is this where the ice rink might go?
IMG_6500.jpeg


IMG_7323.jpeg


IMG_7322.jpeg


New lifts installed.
IMG_7324.jpeg


The laneway is still inside the construction zone. I guess no more deliveries in/out for 1 Front St. W. No more regular tenants?
IMG_7319.jpeg


Looking for new short term or maybe long term tenants?
IMG_6506.jpeg


IMG_6504.jpeg
 

Attachments

  • IMG_7325.jpeg
    IMG_7325.jpeg
    626.4 KB · Views: 17
Great photo. I assume the blue circled 'structures' in Phase 1 are the equivalent of those in Phase 2

View attachment 616097
The blue circled part on the under construction tower is actually the shorter part on the phase 1 completed tower. So you should be circling the shorter part on the tower to the left. The new tower will continue to rise on the on right hand side.
 

Back
Top