Two pictures of the bridge this morning and the rest from Saturday.

Getting ready to pour a new edge next weekend?
Yes, they seem ready to tidy it up but I will be interested to see if they then start to construct the NEW bridge. Has anyone an idea if it will be poured, hoisted into place or 'bolted' to the current rail bridge?
 
Last edited by a moderator:

bbto32

New Member
Member Bio
Joined
Mar 28, 2021
Messages
8
Reaction score
182
Today
IMG_20221201_160818.jpg
IMG_20221201_160830.jpg
 

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
16,191
Reaction score
18,139
Location
St Lawrence Market Area
Dear Neighbours,

As you know, demolition of the Yonge Street viaduct started this October.

We’re happy to update that we’ll be finishing demolition this weekend (December 3rd and 4th) and are moving on to the next phase of construction, which includes building back the perimeter concrete edge beam of the wall. During this phase of construction, vehicle access to Yonge street will be maintained with some restrictions for the safety of workers and drivers. Two lanes of traffic on Yonge Street will be reduced, with the northbound and southbound lanes switched to one side of the street.

This work is scheduled to take place Monday, December 5 to Friday, February 10, between the hours of 7AM to 10PM.
 

UtakataNoAnnex

Senior Member
Member Bio
Joined
Mar 5, 2020
Messages
4,598
Reaction score
6,551
Is everyone enjoying today's game of spot the bot? We're just wondering what it will do next.

42
If you've been running some sorta Turing test with the commentary, I haven't been paying attention...

...of coarse, I would turn the tortoise back over on its legs...in case you where wondering though. >.<
 
Last edited:

Tunafish13

Active Member
Member Bio
Joined
Jun 19, 2019
Messages
274
Reaction score
560
I know these buildings arent even done yet, but what are the chances the rail park gets "filled out"? Does CIBC own all the air rights between their buildings and just chose to leave some empty?
 

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
26,415
Reaction score
32,340
Location
by the Humber
I know these buildings arent even done yet, but what are the chances the rail park gets "filled out"? Does CIBC own all the air rights between their buildings and just chose to leave some empty?
There's no chance that Ivanhoé Cambridge and Hines (who own this complex) will make a larger park. What's being built represents the portion of the site the City requires as parkland, even though they don't technically own that space under the deck that they are building. That deck is expensive to build.

There have been other posts on UrbanToronto, and comments on some front page stories, wondering if more park decks over the rail corridor east of Union Station might get built in the future… but there's a different context on the east side: the tracks are all up on a berm, and building over them would create a huge wall/island up in the air. Even on the west side where the tracks are depressed in a trench compared to the height of the land on either side, people already complained enough about how high the deck of the Rail Deck Park/Rail Deck District development would have to be built over the tracks so that one of the interior parking levels was deleted so as to make the climb up to the park less onerous. There's also far easier access on the west side with both Front Street to the north and Iceboat Terrace to the south at grade, something that just doesn't exist to the east…

…so I'd be very surprised if anything more ever gets built over the tracks on the east side of the station.

42
 

Otis_YVR

Active Member
Member Bio
Joined
Jan 17, 2019
Messages
116
Reaction score
814
These new pieces of steel look like they‘re the connectors that will form the ‘plate’ of the cantilevered support structure.

9935176D-9685-47BE-8DE2-66CF40C3F90D.jpeg


📷: @Johnny Au

99B65A4A-E121-4ACF-AE55-8FE8F0ED6C72.jpeg

“12 steel nodes form the base of the bracing structure, providing connection points for steel beams that extend out to the edge of the building’s elevations. From there, another set of nodes are used to connect the steel beams, creating a plate of sorts, upon which the total load of the building will be laid and redistributed down to the core. The steel structure itself is shown isolated in another diagram [above].“

Diagram and text: UT homepage article
 