Michael62
Active Member
UP is done, there ain't no more UP from my side Friday
Westside UP (last core jump from my side)
MIDDLE
BOTTOM
Eastside General
A close look at the final concrete work on the south-west retail. The top perimeter formwork is creating a parapet edge cap.
This will eventually be a green roof
Continuing to add the post and beams steel and corrugated metal decking to the eastern side of the low rise building that contains the bus depot and I think Metrolinx Offices above
Westside UP (last core jump from my side)
MIDDLE
BOTTOM
Eastside General
A close look at the final concrete work on the south-west retail. The top perimeter formwork is creating a parapet edge cap.
This will eventually be a green roof
Continuing to add the post and beams steel and corrugated metal decking to the eastern side of the low rise building that contains the bus depot and I think Metrolinx Offices above