Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
Today

66BB3554-239A-4687-8EF8-810601FF6E00.jpeg
4633A31B-DE4F-4CB5-923E-6B949CEAE21B.jpeg
 

Attachments

  • 4633A31B-DE4F-4CB5-923E-6B949CEAE21B.jpeg
    4633A31B-DE4F-4CB5-923E-6B949CEAE21B.jpeg
    237.4 KB · Views: 1,018
  • 66BB3554-239A-4687-8EF8-810601FF6E00.jpeg
    66BB3554-239A-4687-8EF8-810601FF6E00.jpeg
    192.5 KB · Views: 981
Future entrance via the pedestrian bridge from Scotiabank Arena
Has anyone seen plans of how the pedestrian link will work on west side of Bay Street? Will there be an overhead walkway inside the ticket lobby of the Scotia Bank Arena that will link to the PATH going to the Arena and QQW - thus avoiding the unpleasant stairs that are the access now? Will there be escalators in the SBA 'lobby' to/from this walkway? (It may be significant that 'they' removed all the artifacts from the old Postal Delivery Building from the walls of the SBA lobby.)
 
Has anyone seen plans of how the pedestrian link will work on west side of Bay Street? Will there be an overhead walkway inside the ticket lobby of the Scotia Bank Arena that will link to the PATH going to the Arena and QQW - thus avoiding the unpleasant stairs that are the access now? Will there be escalators in the SBA 'lobby' to/from this walkway? (It may be significant that 'they' removed all the artifacts from the old Postal Delivery Building from the walls of the SBA lobby.)

http://app.toronto.ca/DevelopmentApplications/mapSearchSetup.do?action=init

Search for 45 Bay Street and you shall have your answers!
 
  • Like
Reactions: DSC
Thanks, from this is appears that the PATH bridge from 45 Bay will just cross Bay and then descend to the 'ticket lobby'. I had hoped it would produce a better connection to the PATH that runs THROUGH the SB Arena towards QQW. This permit, on City Buildings site, shows that that are getting ready:

Permit Issued
Location: 50 BAY ST
TORONTO ON M5J 2X3
Ward 28: Toronto Centre-Rosedale
Application#: 18 149475 BLD 00 BA
Issued Date: Jun 21, 2018
Project:
Arena
Work:
Interior Alterations
Description: Proposal for interior alterations to construct foundations for escalator and elevator pits to connect with future bridge across Bay St to 81 Bay St. - Air Canada Centre
 
Thanks, from this is appears that the PATH bridge from 45 Bay will just cross Bay and then descend to the 'ticket lobby'. I had hoped it would produce a better connection to the PATH that runs THROUGH the SB Arena towards QQW. This permit, on City Buildings site, shows that that are getting ready:

Permit Issued
Location: 50 BAY ST
TORONTO ON M5J 2X3
Ward 28: Toronto Centre-Rosedale
Application#: 18 149475 BLD 00 BA
Issued Date: Jun 21, 2018
Project:
Arena
Work:
Interior Alterations
Description: Proposal for interior alterations to construct foundations for escalator and elevator pits to connect with future bridge across Bay St to 81 Bay St. - Air Canada Centre
They've already completed these foundations for the north escalator and elevator. That was completed prior to the Leafs/Raptors began their respective seasons. They still need to complete the foundation for the south escalator.
 