Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
A different perspective.

20180820_123003.jpg
 

Attachments

  • 20180820_123003.jpg
    20180820_123003.jpg
    343.5 KB · Views: 654
A Friday without Maxime

Westside Story: Pretty much where they were last week at this time just 10m higher in the sky.

Full westside:
IMG_0875.jpg


Westside Core:
IMG_0876.jpg


Eastside Story: Not much work going on during the week, there have been a lot of people looking at concrete pump #4 especially looking at the undercarriage.

IMG_0877.jpg


Track Side: they are installing corrugated sheeting on the top of the steel frame. It's already showing signs of rust.

IMG_0878.jpg
 

Attachments

  • IMG_0875.jpg
    IMG_0875.jpg
    399.8 KB · Views: 939
  • IMG_0876.jpg
    IMG_0876.jpg
    383.8 KB · Views: 932
  • IMG_0877.jpg
    IMG_0877.jpg
    402.5 KB · Views: 889
  • IMG_0878.jpg
    IMG_0878.jpg
    285.3 KB · Views: 955
A Friday without Maxime

Westside Story: Pretty much where they were last week at this time just 10m higher in the sky.

Full westside:
View attachment 154547

Westside Core:
View attachment 154549

Eastside Story: Not much work going on during the week, there have been a lot of people looking at concrete pump #4 especially looking at the undercarriage.

View attachment 154551

Track Side: they are installing corrugated sheeting on the top of the steel frame. It's already showing signs of rust.

View attachment 154552
Latest @Michael62 shots stitched with a quick and crudely applied content aware fill for those pesky panorama gaps. Just ignore the whole right side:
Untitled_Panorama1.jpg
 

Attachments

  • Untitled_Panorama1.jpg
    Untitled_Panorama1.jpg
    367.9 KB · Views: 589
Last edited:
They're pumping concrete, last time it took 18 hours to complete the pour. They started about 11 am so they'll be pumping til dawn. Fortunately, it isn't very noisy

View attachment 154878

Got an email mentioning they'd be pumping until 3AM tonight, so consider til dawn pretty much confirmed. I guess the rains delayed things last week so they're playing a bit of catch up.

Hoping we can see some steel soon!
 
The overtime for the pumping on this project must be insane! Has there been any other builds with such intense concrete pouring schedules?
 

Back
Top