Toronto Cherry House at Canary Landing | 50.32m | 13s | Dream | COBE Architects

April 30
Lot more up on my site

About 1/3+ of the underground parking slab has been pour to start the grade slab in the south west corner
52047007042_e9a9cf803f_b.jpg

52048055336_5fc6ec365c_b.jpg

52048558695_1720510e87_b.jpg

52047008757_10a621b36a_b.jpg

52048057006_3669b54e87_b.jpg

52048300259_459de92e4e_b.jpg

52048106143_b694afa7a5_b.jpg

52048106498_0d8b8f25c5_b.jpg

52048564230_e077538dbd_b.jpg

52047014292_cf2e3b5d4e_b.jpg

52048305469_1eed821199_b.jpg

52048306464_64fe207522_b.jpg

52047016682_6448512ed3_b.jpg

52048567600_7ac7f1bd6a_b.jpg

52048307729_70508766a7_b.jpg

52047019597_55c695f400_b.jpg
 
Very stooopid question time: Are they planning on making a gravel only underground parking lot here? Cause, I'm not sure why they're erecting the columns first...

...or is there something I missed a few pages back to as to why they're doing it this way. 🙀
No

Slab being pour starting to the west and seen above as noted. Dig hole, place infrastructure underground, pour columns, lay gravel, pour concrete and start placing scaffolding for next level.
 
Photos taken June 10th, 2022:

DSC08029.JPG


DSC08030.JPG

DSC08032.JPG


****

There; that's the first part of today's walk..........now it's time to make dinner......

Seared Beef Tendeloin crusted simply in sea salt and freshly cracked black pepper, and basted w/brown butter, alongside some Yukon Gold Potato roasted in duck fat; and then a bit of Sea Asparagus to add some vibrant
green and a saline element to the plate, along side flash-fried Red Bell Pepper, and julienned carrot.

Tonight's wine is an exquisite Petit Sirah.

Back, later.
 
Looks like they’ve finally started shoring for the south building.
View attachment 408864View attachment 408865
I was under the impression that the south building was originally going to be a condo (though it's be the same from a planning approvals perspective), so maybe they changed their mind to move faster (in the face of rising hard/soft costs)....or maybe I'm just speculating too much
 
I was under the impression that the south building was originally going to be a condo (though it's be the same from a planning approvals perspective), so maybe they changed their mind to move faster (in the face of rising hard/soft costs)....or maybe I'm just speculating too much
What makes you think it's NOT a condo?
 
How much did this project stall during the labour action? I feel like apart from the southern piling, everything else looks about the same from weeks back.
 
Dear Ottawan: The resolution on your photo makes it look as though you took it FROM Ottawa!
Yeah, I debated whether this one should be posted. Erred on the side of doing so for a future before / after comparison.

Also, I'm about to acquire a proper camera with telephoto lens, so should be able to take better distance shots next time I'm up the Tower. Although it was 13 years since my last trip up...
 
Last edited:

Back
Top