nfitz
Superstar
Let's hope not. Didn't they fire two consecutive contractors because of how poorly that project was going?Probably around the same amount of time it took for line 1 to be from whenever they started.
Let's hope not. Didn't they fire two consecutive contractors because of how poorly that project was going?Probably around the same amount of time it took for line 1 to be from whenever they started.
I meant once they actually started with what we currently have.Let's hope not. Didn't they fire two consecutive contractors because of how poorly that project was going?
There's no concrete timeline. They dont have full funding in place to convert the line.When is Line 2 expected to be fully ATC?
It's been said that the Line 2 extension would put Line 2 at capacity so hopefully they can ATC it before then.
Why should that be, if it's mostly just replacing the SRT that already just funneled people into Line 2?It's been said that the Line 2 extension would put Line 2 at capacity so hopefully they can ATC it before then.
Because Line 2 was near capacity already, and the SRT was a bottleneck. A significant reduction in travel time will surely increase ridership.Why should that be, if it's mostly just replacing the SRT that already just funneled people into Line 2?
Funding secured...
Capacity improvements coming to Bloor-Yonge Station - Canada.ca
Toronto, Ontario, December 9, 2022—Today, the Honourable Chrystia Freeland, Deputy Prime Minister of Canada and Minister of Finance; the Honourable Dominic LeBlanc, Minister of Intergovernmental Affairs, Infrastructure and Communities; the Honourable Caroline Mulroney, Ontario’s Minister of...www.canada.ca
PEDs for Line 2 might conflict with a likely timetable for ATO on that line. If the trains can’t stop accurately then not much point.Let me guess. No platform screen doors for Bloor & Yonge station expansion. If some pushes or falls on the tracks, just collateral damage. Transit, cycling, and pedestrian safety is low priority in this city.
All hail the almighty automobile.
The Line 1 trains at St George do stop where the arrows show they'll be. I haven't had issues with that.PEDs for Line 2 might conflict with a likely timetable for ATO on that line. If the trains can’t stop accurately then not much point.
IIRC some trials were done on line 1 to paint door locations on a few platforms. Wonder how that turned out…