NorthshoreCity
Active Member
I've been having a hard time believing that a 45 storey building was stuffed into 133M so I dug up the architectural plans and it is 148.9M to the T.O. mech. penthouse. Database can be updated per the 2019 architectural plans for buildings B & C via:
app.toronto.ca
![app.toronto.ca](https://www.toronto.ca/wp-content/themes/cot/img/share_toronto_twitter.jpg)
Application Details
![app.toronto.ca](https://www.toronto.ca/wp-content/themes/cot/img/favicon-32x32.png)