Marcanadian
Moderator
945 LAKE SHORE BLVD E
The proposed development involves dismantling the existing pre-engineered metal structure (the JumboStage) at its current location at 75 Commissioners Street, and relocating the structure to the subject site (945 Lake Shore Boulevard East), where it is to be reassembled immediately. This proposal also includes the development of two additional film and television production studios (referred to as Stage 5 and 6).
http://app.toronto.ca/DevelopmentAp...icationsList.do?action=init&folderRsn=4500138
The proposed development involves dismantling the existing pre-engineered metal structure (the JumboStage) at its current location at 75 Commissioners Street, and relocating the structure to the subject site (945 Lake Shore Boulevard East), where it is to be reassembled immediately. This proposal also includes the development of two additional film and television production studios (referred to as Stage 5 and 6).
http://app.toronto.ca/DevelopmentAp...icationsList.do?action=init&folderRsn=4500138