Toronto 88 Scott Street | 203.9m | 58s | Concert | P + S / IBI

It's moving at a pretty typical pace.

The only thing which has gone slowly was the demolition of the old structure. I gather that was because they were carefully dismantling the building in order to preserve the facade for re-use. That part alone took several months, whereas it likely could've been done in a couple of weeks if they had done a regular demolition and simply turned the whole thing to rubble.
 
Second crane is up

wILzu2s.jpg


cN1LjnR.jpg
 
Although it's not all that tall, this is one that i'm looking forward to seeing rise. It's not a complete square box from top to bottom. That alone is enough to grab my attention.
 
It's a square box to me minus the uppermost levels. It's true that it isn't all glass though. Can't say if that is is a half full or half empty thing. See how the faked steps between concrete and glass translate in real life.
 
January 8th update:

IMG_20150108_140105.jpg



IMG_20150108_140122.jpg



IMG_20150108_140205.jpg



IMG_20150108_140208.jpg
 

Attachments

  • IMG_20150108_140105.jpg
    IMG_20150108_140105.jpg
    1.9 MB · Views: 1,724
  • IMG_20150108_140122.jpg
    IMG_20150108_140122.jpg
    2 MB · Views: 1,679
  • IMG_20150108_140205.jpg
    IMG_20150108_140205.jpg
    2.3 MB · Views: 1,736
  • IMG_20150108_140208.jpg
    IMG_20150108_140208.jpg
    2.4 MB · Views: 1,724

Back
Top