UrbanAffair
Senior Member
Agreed, this looks much better.
I suspect that since the application was supposedly in the "without prejudice" stage it should not have been posted by the City.The drawings don’t appear to be on the Dev App website anymore? Was hoping to peruse through them.
- [13] The current proposal contemplates a 13-storey office building incorporating at-grade retail units. There are to be three distinct five-storey volumes, which include the two listed heritage buildings on the Doubledown-owned portion of the subject site. Ms. Dale-Harris pointed out that the original proposals envisioned significantly higher towers and higher densities. She described substantial changes in the current proposal, not only in respect of the height and massing but a significant 23-25% reduction in proposed density, as well. In addition, she described changes, providing setbacks from adjacent properties, and a deliberate and sensitive arrangement of the development, where the tower portion thereof is significantly setback above the proposed five-storey volumes, achieving a clear distinction between the tower and the two heritage buildings.
- [26] THE TRIBUNAL ORDERS, on an interim basis, that the appeals are allowed in part and the Zoning By-law Amendment is approved in principle. The Tribunal will withhold its final Order pending completion of the items set out in Attachment 1.