Toronto 4696 Yonge Street | 131.3m | 40s | Skale | Turner Fleischer

AlbertC

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
22,644
Reaction score
61,597
Location
Davenport


4696 YONGE ST


The proposed development would remove the gas bar and commercial service station and replace these uses with a 40-storey mixed use building with 35,311.1 square metres of residential gross floor area and 718.8 square meters of ground floor retail gross floor area fronting Yonge Street for a total of 36,029.9 square meters and a floor space index of 14.09.


469y6.JPG
469y5.JPG
469y4.JPG
469y3.JPG
469y2.JPG
469y.JPG
 
Front page story here, where we mention that there is one elevator for every 179 suites in this 536-suite proposal. If one elevator is move-in service, that's one elevator for every 268 suites. If some overgrown kid at the same time plays with the buttons, that's one elevator for every 536 suites.

stuck-elevator.gif


Looks like a Christmas tree! You'll be wanting to stare at one as you wait for your elevator.

42
 
This proposal highlights the need to extend the Beecroft Ring Road south to Florence Ave which already has a signalized intersection with Yonge. With Doris Ave on the east side of Yonge already slated for extension from Sheppard down to Avondale Ave, such a Beecroft extension is needed to complete 'the ring' with the Beecroft/Doris ring roads.

Transitional density rights could be given to properties between an extended Beecroft and Yonge (a degree of compensation for getting stuck with a tower next door). I realize the areas official plan would need updating followed by some slow land assembly/expropriation, but it's the only sensible way forward for this pocket.

1716002508511.png
 

Back
Top