this project is stunning.

Funny how it looks far more polished than the million dollar freed Condominium a few blocks down.
 
wonder what kind of retail going to go in....Starbucks would be good!


Agreed!!!

Great Pictures guys! As usual thanks for posting and please keep them coming! Yeah, this building is looking real nice.

There is room for multiple retail, I wonder what they will put in there?
 
June 30
5892269987_1df5e0aaf3_b.jpg


5892840302_ca913bd3b4_b.jpg


5892845940_71fd5b27f5_b.jpg


5892279937_9d6acc703d_b.jpg



 
great pictures as usual! Once they do the bricking and the balconies, the hard exterior work will be done, correct guys? As for the inside they have a move in date early 2012 so that gives them a lot of time to complete the inside!
 
They seem to have finished the front on the part of the building that doesn't jut out, as well as built the scaffolding on the front part.
 
Pics taken July 15, 2011


t0iIX.jpg



AX17i.jpg



tTb8Z.jpg



B0AYd.jpg



ikqdc.jpg
 
Walked by the site at lunch. They were powerwashing alot of the completed brickwork and it was looking great. The Wellington side of the building is really going to punch with the brickwork design done by SMV. A clean grey brick is looking much better.
 