Toronto 299 Ossington | ?m | 3s | ROC Developments | StudioAC

Taken 30 July.

IMG_5992.jpeg

IMG_5993.jpeg
IMG_5994.jpeg
IMG_5995.jpeg
IMG_5996.jpeg
IMG_5997.jpeg
IMG_5998.jpeg
IMG_5999.jpeg
 
The residential units are all listed for lease now, and I'm going to venture a guess that Studio AC did not have the interiors in their scope of work. Or they did, and the developer tossed out their specs/drawings and just went to Home Depot instead. The bathrooms are simply grim (with some unfortunate door swings), the staged unit doesn't even fit the furniture (why so many cabinets?) and the hardware, fixtures + finishes throughout are a real disappointment after following along all this time. A mess!
 

Back
Top