mikejb
Active Member
Well, it looks like there won't be much activity on that site for a while. The gas station told me they will be shutting down at the end of the month.
A Case Management Conference is scheduled for October 16, 2018.And here's the case file:
http://www.omb.gov.on.ca/ecs/CaseDetail.aspx?n=PL180573
No prehearing scheduled yet.
[4] The settlement proposes a development of an eleven-storey mixed-use building with 65 two-bedroom dwellings, 22 three-bedroom dwellings and a retail unit at grade level. The proposed development will contain a six (6)storey podium with a tower setback starting at the 7th-storey. The amenity space and mechanical penthouse located on the 11th-storey will have a further setback
[5] Parking for the proposed development will contain 58 underground parking spaces, two (2) ground level visitor parking space, and 62 bike parking space.
[6] A 112.2 square metres Privately Owned Public Space (the “POPS”) will be constructed along the west side of the proposed development. The POPS will give direct access to the Duplex Parkette.
[12] The Tribunal will allow the appeal and direct that the Zoning By-law be amended but will withhold its final Order approving the Zoning By-law Amendment Application for 2908 Yonge Street until such as the City Solicitor confirms that the following Conditions of Approval have been satisfied.