W. K. Lis
Superstar
The ash on the brownfield is just burnt leftover cookie crumbs left behind.The smoke drifting in from the wildfires must be getting to me![]()
|
|
| |||||||||||||||||||||
|
The ash on the brownfield is just burnt leftover cookie crumbs left behind.The smoke drifting in from the wildfires must be getting to me![]()
I keep telling myself that they came through at U Condos… here's hoping they can match and beat that quality here.I am optimistic that this latest news means that activity at this site will proceed on a quicker timeline.
I'm pessimistic about the build quality of the towers that Pemberton touches.
No need to keep reassuring yourself. U was and is a very good project. Bay-facing side should have been retail, but that's water under the bridge.I keep telling myself that they came through at U Condos… here's hoping they can match and beat that quality here.
42
How's that expression go? Throw enough $h!t at the wall, some of it is bound to stick?No need to keep reassuring yourself. U was and is a very good project. Bay-facing side should have been retail, but that's water under the bridge.
First Capital (FCR) has proposed to build a new Park Lawn GO Station in partnership with Metrolinx. Learn about the station and provide your feedback until September 10: https://t.co/lSn68fqlEq
— GO Expansion (@GOExpansion) August 31, 2021
If you think this is overdense, having a GO station on site, what do you think of the Colossus redevelopment, which is apparently higher density: I heard 1700 people + jobs per hectare quoted in the DRP posted today.This development has me excited, though I reckon it's over-dense.
Families of buildings at 2150 Lake Shore, Toronto. This drawing demonstrates how tall buildings are nested into clusters of medium and lower-rise buildings to gently integrate them into their urban fabric.