Mississauga 185 Enfield | ?m | 35s | GWL | Kirkor

DJI_0540.JPG
 
When I shot the site a few days ago, it looks like only the area with the orange trap is will be the only being excavated for this phase of work.

There is no shoring on the east side to the north of this excavation and would indicate there is an 4th tower plan for this site or will be something else.
 
When I shot the site a few days ago, it looks like only the area with the orange trap is will be the only being excavated for this phase of work.

There is no shoring on the east side to the north of this excavation and would indicate there is an 4th tower plan for this site or will be something else.
There is going to be a 4th tower @ 36s.
 

Back
Top