Saturday, and another long day at the 160 Front Street construction site. At 7:20 this evening, the crane, which had been working all day, was still operating.
Love the effect this building has from Union Station, seemingly closing off the west end of Front St and accentuating that 'square-like' effect of the space between Union Station and the Royal York!
≈Saturday, and another long day at the 160 Front Street construction site. At 7:20 this evening, the crane, which had been working all day, was still operating.
I don't think I'll ever match the quality of the photos everyone's been posting here but I think this one fills out the skyline very nicely from a wide range of views.